When lapping the eave metal overlap them so the seam faces away from the direction of prevailing view.
Proper way to install roof drip edge.
Align the leading bottom edge of the first piece on the gable rake with the front edge of the drip edge installed on the eave.
Make sure the outer edge extends over the gutter.
If it doesn t pull the drip edge out slightly from under the shingles.
This could cause the sheathing or fascias to rot after a few years.
Slip the wide flat flange of the material all the way under the first course of roof shingles as illustrated.
Preformed drip edge can be made of aluminum galvanized steel or copper.
Slightly open the hemmed edge to slide this piece over top of the installed piece on the eave.
How to fix a roof drip edge installing roof drip edge flashing properly.
Tip 2 is.
When this occurs the water may run back under the edge of the shingles often wetting the roof deck.
Install roof drip edge along the eaves add underlayment then place drip.
Secure the drip edge with roofing cement.
The causeway connecting the house to the new garage in law suite needs a roof.
Place the metal roof drip edge flashing along the gable ends.
The roof leg should extend a minimum of 2 back onto the roof sheathing.
Overlap pieces at least a couple of inches shingle style with pieces higher up on the roof overlapping pieces lower.
To install a drip edge on a newly constructed roof or on a re roofing job attach the drip edge along the roof s eaves first.
How to install a drip edge.
Apply a continuous bead of cement along the top of the drip edge then press down on the shingle.
Save yourself some.
How to install drip edge flashing to a new roof.
Three tips for overlapping drip edge flashing.
The easiest way to prevent this from happening is to install a drip edge at the eave and the rake.
Tom silva starts off his roofing lesson with the apprentices by stressing the.
While the vertical leg should be placed 1 4 1 2 away from the fascia.