Ideally the roof covering material would be installed as soon as possible but in reality the roof may be protected by only the underlayment for days weeks or sometimes months.
Proper roofing underlayment installation.
It must be covered with waterproofing membrane usually roof felt also.
Gcp applied technologies grace ice water shield roofing underlayment requires side laps to be a minimum of 90 mm 3 5 in and end laps a minimum of 150 mm 6 in.
Minimum overlap guidelines are set by the manufacturer.
For three tab shingles place two quarter size spots of plastic roof cement under the lower corners of each tab as shown in figure 2 7.
This article series discusses roofing felt specifically addressing the roofing code or roofing manufacturer s requirements for use of an underlayment such as roofing felt tarpaper or other underlayment products beneath asphalt shingles and other.
Roofing underlayment roofing felt requirements.
Center a minimum 610 mm 24 wide minimum 28 gauge pre finished galvanized metal valley liner in the valley and fasten with only enough nails to hold it in place nailing at the edges only.
Overlap each metal piece by at least 150 mm 6 and use asphalt plastic cement under each section of overlap.
Roof underlayment prevents the roof deck from being exposed to the elements before or while the roofing material is being installed.
It starts with installing solid decking usually plywood or oriented strand board but that is not waterproof.
Is roofing felt required.
There is a direct connection between membrane performance and proper application.
Roof slopes greater than 4 12 require only one layer of underlayment.
Felt details for various roof slopes amp.