0 032 inch aluminum or prefinished alu minum.
Prefinished aluminum flashing over roof membrane.
Prefinished and preformed gutters collection boxes and downspouts.
However in an effort to make it easier for our customers our top five reasons are highlighted below.
Use aluminum flashing and fasteners in contact with aluminum copper flashing and copper nails with copper roofing gutters etc.
Top quality pre finished steel products for the construction industry.
If you do not wish to form your own corner flashing you can buy pre bent pieces and cut them to size or use a piece of corrugated aluminum which is easier to bend.
Metal cap covers at columns and projections 3.
Class a roof covering assembly c a.
Sealing roof membrane to wall system air and vapor barriers.
Prefinished metal flashings in conjunction with membrane roofing systems in locations noted on drawings.
Batt insulation 5 8 f r t.
Roof shingle over step flashing.
Metal cap flashings 2.
Flashings counter flashings gutters downspouts sheet metal roofing and fabricated sheet metal items.
The use of thicker metal for coun terflashings may be necessary based on the.
Plywood with vps vapor barrier eifs reinforcing mesh eifs finish coat return at end of eifs metal stud framing double up vps vapor barrier over flashing pre finished break metal.
In low slope roof systems.
Cmg offers over 30 standard color choices in steel and aluminum.
Bend the corner flashing tightly around the corner.
Wood blocking site paving slope away from.
Nrca recom mends metal counterflashings be a minimum 26 gauge galvanized prefinished galvanized or stainless steel.
When asked what makes sarnafil membranes different from all the other pvc roofing membranes it is almost impossible to give a simple answer over 55 years of roofing experience and data.
When this is not possible choose a second metal that is not likely to lead to galvanic corrosion or use a physical barrier to separate the two metals.
Membrane adhered to backer unit bonded over plywood to achieve class a fire rating.
Membrane wrapped over column base and covered with pre finished metal flashing.
Flashing reglet extend membrane up cmu 8 min roof see plan pre finished break metal counterflashing over membrane roofing termination pre finished metal flashing keyed into cmu concrete masonry unit with vertical joint reinforcing see structural slope tapered insulation cricket continuous p t.
Dennis brings extensive knowledge and experience to cmg gained through various roles within the metal roofing industry.
Install clamps for roof drain flashing as furnished under section.
Install the following as furnished under the following sections.
Metal flashing at walls door heads window heads and window sills.